Fuel Your Data Center. On Your Timeline.
Grid interconnection queues stretch four to seven years. Aggressive Energy structures custom natural gas supply agreements for BTM on-site generation — from greenfield development through operational ramp — so developers, hyperscalers, and infrastructure investors can move with certainty.
Gas procurement is where BTM projects stall.
Developers who've solved land, capital, and equipment still get derailed by the complexity of securing firm, bankable natural gas supply for generation-scale loads.
Pipeline Access & Interconnect Complexity
Securing firm transportation on interstate pipelines — Transco, Algonquin, Tennessee, Tetco — requires deep LDC relationships, knowledge of open seasons, and the ability to navigate FERC-jurisdictional arrangements. Most developers don't have this on staff.
Price Certainty During Construction & Ramp
Multi-year data center projects span volatile commodity cycles. Without structured supply — fixed, indexed, or layered hedge — construction pro formas break down and lender models lose bankability. The wrong product at the wrong term destroys project economics.
Counterparty Reliability at Scale
BTM generation loads can range from 20 MW to 500+ MW equivalent in gas throughput. At that scale, counterparty credit, delivery reliability, and operational responsiveness aren't negotiable. A supplier who can't perform during a winter demand event is an existential risk.
End-to-end. From project inception to full operation.
We don't sell commodity gas. We structure bespoke supply solutions around your project's specific generation profile, timeline, and risk tolerance — and we stay engaged through every phase.
Project Assessment
- Review generation technology, fuel specs, and load profile
- Identify nearest interstate pipeline infrastructure and LDC delivery points
- Assess project timeline and phased ramp schedule
Custom Gas Structuring
- Design fixed, indexed, or layered hedge structures matched to your debt and equity requirements
- Price term supply for construction, commissioning, and operational phases
- Negotiate contract terms for bankability and lender acceptance
Pipeline & Interconnect Support
- Coordinate firm transportation on relevant interstate systems
- Leverage LDC relationships for expedited delivery point setup
- Support engineering teams on gas quality and pressure specs
Ongoing Supply Management
- Daily scheduling, nomination, and imbalance management
- Proactive market monitoring and exposure reporting
- Supply continuity through outages, peaks, and ramp events
We don't sell off-the-shelf. We structure.
Large commodity desks move volume. We move projects. There's a difference — and sophisticated buyers know it.
Boutique Structuring. Zero Off-the-Shelf.
Every BTM data center project has a distinct generation profile, ramp schedule, and capital structure. We build supply agreements around your project — not around our book. Fixed, indexed, managed, or hybrid — structured to the load, the lender, and the timeline.
40+ Years of Gas Market Expertise
Our team has traded, structured, and supplied gas across every major producing region, pipeline corridor, and demand hub in the country through every commodity cycle since deregulation. We know the pipelines, the LDCs, the basis differentials, and the regulatory nuances.
Nationwide Origination Capability
Data centers get built where land, water, and power align — not where a supplier's retail license ends. We originate and structure gas supply for BTM and grid-connected projects anywhere in the continental U.S., with deep pipeline relationships across all major interstate systems.
We Engage at Any Project Stage
Greenfield site assessment or a facility six months from commissioning — we've structured deals at every stage. Early engagement means better structures and lower all-in cost of supply. If you need a gas partner now, we can turn around term sheet pricing in days, not weeks.
Built for the projects that matter most.
Whether you're breaking ground or scaling existing load, Aggressive Energy structures supply that fits your operational reality.
New Data Center Campus
A developer or PE-backed platform building a new 200–500 MW campus with no existing gas infrastructure. Grid interconnection is 5+ years away; the project needs BTM gas power from day one.
- Early-stage gas feasibility assessment tied to pipeline laterals and LDC delivery points at or near the site
- Multi-phase supply structure matching phased construction draws and commissioning milestones — locked pricing for lender debt packages
Colo Facility BTM Add-On
An existing colocation operator facing utility capacity constraints, deploying behind-the-meter gas generation to supplement grid power and reduce curtailment exposure.
- Incremental supply layered on top of any existing gas contracts — no disruption to current arrangements
- Index-based or swing supply products designed for the variable, on-demand dispatch profile of standby and supplement generation
Hyperscale On-Site Power Plant
A hyperscaler or infrastructure fund developing a dedicated gas-fired power facility co-located with a 1+ GW AI training campus. Gas supply reliability is a board-level concern.
- Long-term structured supply agreement with fixed or layered hedge components built to satisfy project finance lender requirements
- Dedicated origination support through financial close, construction, and first gas — with ongoing scheduling post-commissioning
Your data center project needs a gas partner who understands power.
Let's structure something that works — for your load, your lender, and your timeline. Our origination team is ready to engage at any project stage.